The tramway will have a short isolated section for stock storage. The tram board was slightly extended to comfortably accommodate the tram in the isolated section. A short siding will also be added to the tramway so the engineering locomotive (the Class 33) can be stored out of the way when the tram is in operation. Once the track is finalised then it can be fixed down and scenery can be developed.